Shores of Hazeron


H.Conifer

H.Conifer by Krusseldorf
DESCRIPTION

The Conifer hospital supports 65600 population. Intended to be paired with one Hyperion-Design House.


This design contains an excess of 404m³ volume above the theoretical minimum needed for this size. However much of that has been invested into commodity storage, as medical supplies are crucial to curing pandemics.


This is a harsh variant. See Conifer for more efficient habitable environments.


Unlike other large designs in the series, the H.Conifer is armored because the added material cost was negligible.


The green textures were cropped by me for use in this specific design.


BUILDING
34m³ Batteries, 5 Terajoules
270m³ Commodity Storage, 3,178 Units
27,880m³ Office Space, 820 Offices
1 Surgery Units
Environments
Land and Atmosphere with Breathable Air Ok
Land and Atmosphere with Unbreathable Air Ok
Land and Atmosphere in Frigid Zone, Gas Giant Sea and Atmosphere Ok
Land and Atmosphere in Inferno Zone Ok
Sea Bottom Ok
Sea Bottom in Frigid Zone Ok
Gas Giant Core Ok
Intended Use Hospital
Uses
Hospital

STRUCTURE
Stone Q1 Construction
Armor 5 Absorbs 18%+108hp Damage
Framework 0% of Structure
41,952m³ Volume
56m Length
45m Width
144m Height
Model Size
15,838 Faces
20,004 Triangles

ELECTRONICS
Medic Console, Surgery Medical Module, Part Id 339
3,280m³ Life Support
Life Support Gravity Module Q1

DAMAGE CONTROL
34,833 Total Hit Points
34,375 Structure Hit Points
221 Commodity Storage
34,154 Hull
458 Equipment Hit Points
4 Battery
1 Command and Control
452 Life Support
1 Medical

CONSTRUCTION
Estimated Build Time 25 minutes, 46 seconds.
453 Electronic Part
453 Grav Coupling
453 Mechanical Part
464 Metal
453 Plastic
3,441 Stone
457 Textiles
Computer
Electricity
Glue Gun
Hammer
SUV
Sewing Needle
Shovel
Soldering Iron
Wrench