FalCorp Mine 10 to underground by Falkenkopf
DESCRIPTION
Mine building, that leads to underground.
367m³ left
BUILDING26m³ Commodity Storage, 306 Units
34m³ Office Space, 1 Offices
910m³ Workshop Space, 10 Workshops
Environments
Land and Atmosphere with Breathable Air Ok
Intended Use
MineUses
Airport Repair Shop
Armorer
Bakery
Bank with Mint
Brewery
Carpenter
Clothing Factory
Computer Factory
Dairy
Distillery
Electronics Factory
Explosives Factory
Grist Mill
Hangar
Jeweler
Lumber Mill
Machine Shop
Meat Processing Plant
Mine
Munitions Factory
Nuclear Fuel Plant
Observatory
Paper Mill
Pharmaceutical Lab
Plastics Factory
Police Station
Refinery
Rocket Motor Factory
Smelter
Sugar Mill
Textile Mill
Treatment Plant
Warehouse
Weapon Smith
Well
Wharf
Winery
STRUCTUREStone Q1 Construction
Unarmored Absorbs 18%+18hp Damage
Framework 27% of Structure
1,337m³ Volume
17m Length
10m Width
12m Height
Model Size
5,162 Faces
5,331 Triangles
DAMAGE CONTROL332 Total Hit Points
332 Structure Hit Points
3 Commodity Storage
200 Framework
129 Hull
CONSTRUCTIONBuild time estimate and construction process are based on the original design configuration.
Estimated Build Time 14 seconds.

44 Stone

Computer

Electricity

Hammer

SUV

Shovel
DESIGN PARTS
Unpublish Blueprint
To unpublish blueprint FalCorp Mine to underground small-medium.SoH, enter the architect's password here.